Installation of plumbing is a choice of many families, but also a more popular way of heating. Heating become a topic of conversation in people's mouth. Most people know is little, and can not clearly understand how to install.
Plumbing installation steps.
First, the early installation
Prior to the formal paving of the ground facilities, you should first confirm the design drawings, and clean up the scene, etc., do a good job in preparation.
Installation preparation
Second, after entering to clean up the scene of the construction, and to determine the host (hanging furnace) and - water collector installation position, to prepare for the subsequent construction.
Three, fully installed
The temperature control line buried, sub - water collector is also mounted to the specified location, began laying the ground insulation layer and heating pipes.
Four, plumbing installation steps four: laying insulation layer
According to the actual size of the cutting insulation board, then laying, laying pipelines to set aside space. After the laying of the thermal insulation board to lay the reflective film. Then in the above laying steel wire mesh, the edge of the two wire mesh to use a dedicated tie with a good connection, and finally you can install the pipe.
Five, laying pipeline
In order to prevent the loss of heat, must be divided - water collector to the pipe installation room on special insulating sleeve. Connect the pipeline to set good insulation sleeve - at the collector, and the pipeline is connected to the temperature control valve on it. Pipeline laying good after, the pipeline of the headgear then returned sub - collector is fixed, so to warm the pipeline all paved.
Six, pressure test
Into the cold water to the pipeline in the pipeline are to be filled with water, and then the special press into the 10kg pressure. Seal 24 hours later, if the pressure of the pipeline at this time is not less than 6kg, no leakage of the pipeline, can be used normally. |